Everything between your roof and your bill.
Four steps, about six weeks, start to power-on.
1
Free assessment
We look at twelve months of bills, your roof and your panel — then tell you what's realistic.
2
Design & permits
Engineering, city permits and Austin Energy interconnection paperwork, filed by us.
3
Install & inspect
Our own crew, usually one to two days on site, then city and utility inspection.
4
Power on & save
We energize the system, file the rebate, and show you how to read your production.



